This particular install proved challenging because I had to cement two wall blocks in the ground with rebar to hold the tension properly for the fence. I used fast set cement so it would cure within two hours. I thought it would be best to pre-drill the blocks so they wouldn’t come loose during curing. I then templated the deck from these blocks and drilled the holes. The fence was then installed and the customer received a nice straight, secure fence.